Table of Contents

UpdateProgressbarAbs Procedure

Codeunit Dialog Mgt

Updates the progress of a progress bar with a absolute number.

Signature

UpdateProgressbarAbs(PlaceholderNo: Integer; AbsoluteValue: Integer)

Parameters

PlaceholderNo Integer

The number of the container (the number in the @-text) that should be updated.

AbsoluteValue Integer

An absolute value that is used to calculate the progress percentage relative to the Max value specified in the InitProgressbar() function. This value should not be greater than the Max value.

This documentation is generated from Smart Toolbox v27.1