Show / Hide Table of Contents

    UpdateNextPeriodStartFromLines Procedure

    Table Contract Header

    Calculates Next Posting Date based on the Contract Lines.

    Next Posting Date for a Contract Header is calculated as the earliest Next Posting Date from any valid line of the contract. Functionality to set Next Action Date for the contract is run, and the Contract Header is updated to the database. This procedure could e.g. be called after changes have been made to a Contract Line.

    Signature

    UpdateNextPeriodStartFromLines()
    

    Remarks

    Next Posting Date will be deleted and replaced with a new field in a future release. Caption of Next Posting Date is Next Period Start.

    This documentation is generated from Parrot v26.2.242726.0

    Back to top Copyright © 2020 SmartApps
    Generated by DocFX