    UpdateNextActionDate Procedure

    Table Contract Header

    Calculates Next Action Date for the current Contract.

    The calculation is based on the Date Setup Code assigned to the contract. If no Date Setup Code is assigned, Next Action Date will be equal to Next Posting Date. This procedure could e.g. be called after assigning Next Posting Date directly, without using validate().

    Signature

    UpdateNextActionDate()
    

    Remarks

    Next Posting Date will be deleted and replaced with a new field in a future release. Caption of Next Posting Date is Next Period Start.