UpdateNextActionDate Procedure
Calculates Next Action Date
for the current Contract.
The calculation is based on the Date Setup Code
assigned to the contract. If no Date Setup Code
is assigned,
Next Action Date
will be equal to Next Posting Date
.
This procedure could e.g. be called after assigning Next Posting Date
directly, without using validate().
Signature
UpdateNextActionDate()
Remarks
Next Posting Date will be deleted and replaced with a new field in a future release. Caption of Next Posting Date is Next Period Start.
This documentation is generated from Parrot v26.2.242726.0